CEQA Scoping Period – Written Comments
2022.06.29 Caltrans official letter - Oakland Harbor Turning Basins Widening Caltrans
2022.06.30 Sheppard Mullin - Letter to Port of Oakland
2022.07.01 RWQCB 4 USACE Oakland Turning Basins Draft EA Comments
2022.07.01 USEPA CEQA NOP Oakland Harbor with Attach EPA Comment
2022.07.05 AGO Oakland Harbor Turning Basins NOP Comments
2022.07.05 BAAQMD Port of Oakland Turning Basins Widening CEQA Letter and Attachment
2022.07.05 CDFW Comment Ltr Oakland Turning Basin NOP 220705